FIDIC Conditions of Contract for Plant and Design Build 2nd Edition by Federation Internationale Des Ingenieurs Conseils – Ebook PDF Instant Download/Delivery: 2884320822, 9782884320825
Full download FIDIC Conditions of Contract for Plant and Design Build 2nd Edition after payment
Product details:
ISBN 10: 2884320822
ISBN 13: 9782884320825
Author: Federation Internationale Des Ingenieurs Conseils
FIDIC Conditions of Contract for Plant and Design Build 2nd Table of contents:
-
Clause 1: General Provisions
- 1.1 Definitions
- 1.2 Interpretation
- 1.3 Communications
- 1.4 Law and Language
- 1.5 Priority of Documents
- 1.6 Contract Agreement
- 1.7 Assignment
- 1.8 Care and Supply of Documents
- 1.9 Errors in the Employer’s Requirements
- 1.10 Employer’s Use of Contractor’s Documents
- 1.11 Contractor’s Use of Employer’s Documents
- 1.12 Confidential Details
- 1.13 Compliance with Laws
- 1.14 Joint and Several Liability
- 1.15 Limitations of Liability
- 1.16 Contractual Authority
- 1.17 Good Faith
-
Clause 2: The Employer
- 2.1 Right of Access to the Site
- 2.2 Assistance
- 2.3 Employer’s Personnel and Other Contractors
- 2.4 Employer’s Financial Arrangements
- 2.5 Site Data and Items of Reference
- 2.6 Employer-Supplied Materials and Employer’s Equipment
- 2.7 Employer’s Claims
-
Clause 3: The Engineer
- 3.1 The Engineer
- 3.2 Engineer’s Duties and Authority
- 3.3 The Engineer’s Representative
- 3.4 Delegation by the Engineer
- 3.5 Engineer’s Instructions
- 3.6 Replacement of the Engineer
- 3.7 Agreement or Determination
-
Clause 4: The Contractor
- 4.1 Contractor’s General Obligations
- 4.2 Performance Security
- 4.3 Contractor’s Representative
- 4.4 Subcontractors
- 4.5 Nominated Subcontractors
- 4.6 Co-operation
- 4.7 Setting Out
- 4.8 Safety Procedures
- 4.9 Quality Management and Compliance Verification
- 4.10 Site Data
- 4.11 Sufficiency of the Accepted Contract Amount
- 4.12 Unforeseeable Physical Conditions
- 4.13 Rights of Way and Facilities
- 4.14 Avoidance of Interference
- 4.15 Access Route
- 4.16 Transport of Goods
- 4.17 Contractor’s Equipment
- 4.18 Protection of the Environment
- 4.19 Electricity, Water and Gas
- 4.20 Employer’s Equipment and Free-Issue Materials
- 4.21 Progress Reports
- 4.22 Security of the Site
- 4.23 Contractor’s Operations on Site
- 4.24 Fossils
-
Clause 5: Design
- 5.1 General Design Obligations
- 5.2 Contractor’s Documents
- 5.3 Contractor’s Undertaking
- 5.4 Technical Standards and Regulations
- 5.5 Training
- 5.6 As-Built Documents
- 5.7 Operation and Maintenance Manuals
- 5.8 Design Error
-
Clause 6: Staff and Labour
- 6.1 Engagement of Staff and Labour
- 6.2 Rates of Wages and Conditions of Labour
- 6.3 Persons in the Service of Employer
- 6.4 Labour Laws
- 6.5 Working Hours
- 6.6 Facilities for Staff and Labour
- 6.7 Health and Safety
- 6.8 Contractor’s Superintendence
- 6.9 Contractor’s Personnel
- 6.10 Records of Contractor’s Personnel and Equipment
- 6.11 Disorderly Conduct
-
Clause 7: Plant, Materials and Workmanship
- 7.1 Manner of Execution
- 7.2 Samples
- 7.3 Inspection
- 7.4 Testing
- 7.5 Rejection
- 7.6 Remedial Work
- 7.7 Ownership of Plant and Materials
- 7.8 Royalties
-
Clause 8: Commencement, Delays and Suspension
- 8.1 Commencement of Works
- 8.2 Time for Completion
- 8.3 Programme
- 8.4 Advance Warning
- 8.5 Extensions of Time for Completion
- 8.6 Delays Caused by Authorities
- 8.7 Rate of Progress
- 8.8 Delay Damages
- 8.9 Employer’s Suspension
- 8.10 Consequences of Employer’s Suspension
- 8.11 Payment for Plant and Materials in Event of Suspension
- 8.12 Prolonged Suspension
- 8.13 Resumption of Work
-
Clause 9: Tests on Completion
- 9.1 Contractor’s Obligations
- 9.2 Delayed Tests
- 9.3 Retesting
- 9.4 Failure to Pass Tests on Completion
-
Clause 10: Employer’s Taking Over
- 10.1 Taking Over of the Works and Sections
- 10.2 Taking Over of Parts of the Works
- 10.3 Interference with Tests on Completion
- 10.4 Surfaces Requiring Reinstatement
-
Clause 11: Defects After Taking Over
- 11.1 Completion of Outstanding Work and Remedying Defects
- 11.2 Cost of Remedying Defects
- 11.3 Extension of Defects Notification Period
- 11.4 Failure to Remedy Defects
- 11.5 Removal of Defective Work
- 11.6 Further Tests
- 11.7 Right of Access
- 11.8 Contractor to Search
- 11.9 Performance Certificate
- 11.10 Unfulfilled Obligations
- 11.11 Clearance of Site
-
Clause 12: Tests After Completion
- 12.1 Programme and Testing
- 12.2 Delayed Tests
- 12.3 Retesting
- 12.4 Failure to Pass Tests After Completion
-
Clause 13: Variations and Adjustments
- 13.1 Right to Vary
- 13.2 Value Engineering
- 13.3 Variation Procedure
- 13.4 Provisional Sums
- 13.5 Daywork
- 13.6 Adjustments for Changes in
- 13.7 Adjustments for Changes in Cost
-
Clause 14: Contract Price and Payment
- 14.1 The Contract Price
- 14.2 Advance Payment
- 14.3 Application for Interim Payment Certificates
- 14.4 Schedule of Payments
- 14.5 Plant and Materials Intended for the Permanent Works
- 14.6 Issue of Interim Payment Certificates
- 14.7 Payment
- 14.8 Delayed Payment
- 14.9 Payment of Retention Money
- 14.10 Statement at Completion
- 14.11 Final Payment Certificate
- 14.12 Cessation of Employer’s Liability
- 14.13 Currencies of Payment
-
Clause 15: Termination by Employer
- 15.1 Right to Terminate
- 15.2 Termination for Contractor’s Default
- 15.3 Valuation after Termination for Employer’s Convenience
- 15.4 Payment after Termination for Employer’s Convenience
- 15.5 Employer’s Entitlement to Terminate
-
Clause 16: Suspension and Termination by Contractor
- 16.1 Contractor’s Entitlement to Suspend Work
- 16.2 Termination by Contractor
- 16.3 Cessation of Work and Removal of Contractor’s Equipment
- 16.4 Payment on Termination
- 16.5 Contractor’s Entitlement to Suspend Work or Terminate
-
Clause 17: Care of the Works and Indemnities
- 17.1 Care of the Works
- 17.2 Employer’s Risks
- 17.3 Contractor’s Risks
- 17.4 Consequences of Employer’s Risks
- 17.5 Intellectual and Industrial Property Rights
- 17.6 Indemnities
-
Clause 18: Exceptional Events
- 18.1 Exceptional Events
- 18.2 Notice of an Exceptional Event
- 18.3 Duty to Minimize Delay
- 18.4 Consequences of an Exceptional Event
- 18.5 Optional Termination
- 18.6 Release from Performance under the Law
-
Clause 19: Insurance
- 19.1 Requirements for Insurance
- 19.2 Policies and Certificates
- 19.3 Scope of Cover
- 19.4 Period of Cover
- 19.5 Amount of Cover
- 19.6 Excesses
- 19.7 Failure to Insure
- 19.8 Claims under Policies
-
Clause 20: Employer’s and Contractor’s Claims
- 20.1 Claims
- 20.2 Claims for Payment and/or EOT
- 20.3 Agreement or Determination of Claims
- 20.4 Payment of Claims
-
Clause 21: Disputes and Arbitration
- 21.1 Constitution of the DAAB
- 21.2 Avoidance of Disputes
- 21.3 Referral to the DAAB
- 21.4 Opinion of the DAAB
- 21.5 Amicable Settlement
- 21.6 Arbitration
- 21.7 Failure to Comply with DAAB Decision
- 21.8 Expired DAAB
People also search for FIDIC Conditions of Contract for Plant and Design Build 2nd:
fidic conditions of contract for plant
fidic conditions of contract for plant and design build
fidic in usa
fidic contract pdf
condition of contract fidic
Tags: Federation Internationale Des Ingenieurs Conseils, Conditions, FIDIC